Our Completed Projects
Turkmenistan Ashgabat 72 Housing Project
Project Name: Turkmennebitgaz Gurluşık Devlek Consortium, 72-Apartment Housing Project
Location: Ashgabat – Turkmenistan
Project Scope: A 12-story, 2-block residential building with 72 apartments, a transformer, a heating plant, water tanks, an underground parking lot, sports fields, children's playgrounds, and landscaping. Construction was carried out using the "Tunnel Formwork" system.
Tender Type: Turnkey Construction, including commissioning of the buildings and maintenance for a 1-year warranty period.
Start Date: June 15, 2010
End Date: 30.10.2011
Covered Construction Area: 20982 m²
Turkmenistan – Ashgabat, 108 Housing Project
Project Name: Turkmen Chemical State Consortium, 108-Apartment Housing Project
Location: Ashgabat, Turkmenistan
Project Scope: A 12-story, 3-block residential building with 108 apartments, a transformer, a heating plant, water tanks, an underground parking lot, sports fields, children's playgrounds, and landscaping. Construction was carried out using the "Tunnel Formwork" system.
Tender Method: Turnkey, including commissioning of the buildings and maintenance for a 1-year warranty period.
Start Date: 01.12.2008
End Date: 31.12.2009
Covered Construction Area: 28472 m²
Turkmenistan - Farap Sanatorium Project
Project Name: Ministry of Health Farap Sanatorium Construction
Location: Lebap Province - Farab city
Project Scope: Construction of a new 200-bed sanatorium building, conversion of the existing unfinished 20-bed building into a 50-bed hotel, medical equipment and supplies, transformer, heating plant, water tanks, thermal and water facilities, swimming pools, sports fields, amphitheater, landscaping and environmental düzenleme.
Tender Type: Turnkey completion of construction, commissioning of buildings and a 1-year period.
Warranty period includes maintenance.
Start Date: March 1, 2009
End Date: June 30, 2010
Covered Construction Area: 14826 m² + 2000 m² (additions)
Turkmenistan Turkmennebitgaz, Ashgabat 72 Housing Project
Project Name: Turkmennebitgaz Gurluşık Devlek Consortium, 72-Apartment Housing Project
Location: Ashgabat – Turkmenistan
Project Scope: A 12-story, 2-block residential building with 72 apartments, a transformer, a heating plant, water tanks, an underground parking lot, sports fields, children's playgrounds, and landscaping. Construction was carried out using the "Tunnel Formwork" system.
Tender Type: Turnkey Construction, including commissioning of the buildings and maintenance for a 1-year warranty period.
Start Date: June 15, 2010
End Date: 30.10.2011
Covered Construction Area: 20982 m²
Khomas Power Plant Infrastructure, Asphalt Roads and Pedestrian Paths Project
Employer: GECOL / KHOMS
Contractor: ÇALIK ENERGY
Project Subject: KHOMS POWER PLANT Infrastructure, Asphalt Roads and Pedestrian Paths Project
Subcontractor: Karan Libya Construction Inc.
Contract Date: September 12, 2016
Completion Date: February 2, 2017
Project Amount:
Pedestrian walkways 4700 m2
Paving Stones 4417 m2
Asphalt 42,470 tons
PMT 78,077 tons